Telecomm Racks Meet Zone 4 Seismic Requirements

Nov. 1, 2001
Designed to meet Telcordia GR-63-CORE seismic Zone 4 requirements with a load rating of 500lb., new telecomm racks are available in 23" and 19" versions. They are intended for use as the primary support structure for splicing and termination

Designed to meet Telcordia GR-63-CORE seismic Zone 4 requirements with a load rating of 500lb., new telecomm racks are available in 23" and 19" versions. They are intended for use as the primary support structure for splicing and termination enclosures, cable management, and active equipment.Other features include meeting all requirements of EIA/TIA 310-D and a universal design that allows them to be used as drop-in replacements for other manufacturersÕ racks. For further information and prices, contact PANDUIT CORP., Tinley Park, IL. (866) 405-6654.

Company: PANDUIT CORP.

Product URL: Click here for more information

Sponsored Recommendations

What are the Important Considerations when Assessing Cobot Safety?

April 16, 2024
A review of the requirements of ISO/TS 15066 and how they fit in with ISO 10218-1 and 10218-2 a consideration the complexities of collaboration.

Wire & Cable Cutting Digi-Spool® Service

April 16, 2024
Explore DigiKey’s Digi-Spool® professional cutting service for efficient and precise wire and cable management. Custom-cut to your exact specifications for a variety of cable ...

DigiKey Factory Tomorrow Season 3: Sustainable Manufacturing

April 16, 2024
Industry 4.0 is helping manufacturers develop and integrate technologies such as AI, edge computing and connectivity for the factories of tomorrow. Learn more at DigiKey today...

Connectivity – The Backbone of Sustainable Automation

April 16, 2024
Advanced interfaces for signals, data, and electrical power are essential. They help save resources and costs when networking production equipment.

Comments

To join the conversation, and become an exclusive member of Electronic Design, create an account today!