Satellite TV Relay Planned Within Year

Nov. 6, 2000
Experimental intercontinental television transmission via an active satellite repeater is planned within a year by AT&T. This satellite, to be orbited at a 2200-mile altitude, will mark the first commercial venture into space. AT&T is...

Experimental intercontinental television transmission via an active satellite repeater is planned within a year by AT&T. This satellite, to be orbited at a 2200-mile altitude, will mark the first commercial venture into space. AT&T is designing the payload, but is asking for assistance from NASA with a launch vehicle and suitable facilities. This will mark a step beyond the passive reflector of Project Echo and the delayed repeater of Project Courier.

The link will allow one-way tv transmission between the United States, United Kingdom, and Europe for about 35 minutes, three or four times a day—when the satellite is in line-of-sight range of both transmitting and receiving stations. The satellite will be about four feet in diameter and weigh about 175 lb. Transmitter power is limited: it will be difficult to transmit much more than a kilowatt from a ground station operating in the 6 kmc region, and the output of the satellite's traveling wave tube will be held to about 2 w. (Electronic Design, Nov. 9, 1960, p. 4)

This is the Telstar I, which was launched in 1962. The NASA Web site (www.roland.lerc.nasa.gov/~dglover/sat/satcom2. html#Telstar) is rich in information on the early space programs. Telstar I and Telstar II (launched in 1963) were prototypes for a set of 50 satellites planned by AT&T. When the government gave control of satellite communications to Comsat, AT&T's project was halted.

Sponsored Recommendations

The Importance of PCB Design in Consumer Products

April 25, 2024
Explore the importance of PCB design and how Fusion 360 can help your team react to evolving consumer demands.

PCB Design Mastery for Assembly & Fabrication

April 25, 2024
This guide explores PCB circuit board design, focusing on both Design For Assembly (DFA) and Design For Fabrication (DFab) perspectives.

What is Design Rule Checking in PCBs?

April 25, 2024
Explore the importance of Design Rule Checking (DRC) in manufacturing and how Autodesk Fusion 360 enhances the process.

Unlocking the Power of IoT Integration for Elevated PCB Designs

April 25, 2024
What does it take to add IoT into your product? What advantages does IoT have in PCB related projects? Read to find answers to your IoT design questions.

Comments

To join the conversation, and become an exclusive member of Electronic Design, create an account today!