Power Supply Test System Challenges ATE

June 1, 2000

Claiming significant productivity improvements over traditional ATE, the Intepro 9000 power supply test system uses a new test methodology to perform comprehensive testing of ac/dc and dc/ac converters. The new methodology eliminates the duplication of measurements and the need for fixed time delays waiting for the power supply to settle.
A single multi-function measurement module performs all the necessary measurement functions including ripple/noise, transients, dc/ac voltage, resistance, and timing. Other modules include scanners, sources and relays. A range of programmable dc loads are also available.

Sponsored Recommendations

What are the Important Considerations when Assessing Cobot Safety?

April 16, 2024
A review of the requirements of ISO/TS 15066 and how they fit in with ISO 10218-1 and 10218-2 a consideration the complexities of collaboration.

Wire & Cable Cutting Digi-Spool® Service

April 16, 2024
Explore DigiKey’s Digi-Spool® professional cutting service for efficient and precise wire and cable management. Custom-cut to your exact specifications for a variety of cable ...

DigiKey Factory Tomorrow Season 3: Sustainable Manufacturing

April 16, 2024
Industry 4.0 is helping manufacturers develop and integrate technologies such as AI, edge computing and connectivity for the factories of tomorrow. Learn more at DigiKey today...

Connectivity – The Backbone of Sustainable Automation

April 16, 2024
Advanced interfaces for signals, data, and electrical power are essential. They help save resources and costs when networking production equipment.

Comments

To join the conversation, and become an exclusive member of Electronic Design, create an account today!