Latest from Test & Measurement

Dreamstime_Phitchaya-Phansopha_181186959
dreamstime_phitchayaphansopha_181186959
ID 395369077 © BiancoBlue | Dreamstime.com
virtualreality_dreamstime_xl_395369077
Dreamstime_Josepalbert13_200048283
dreamstime_data__josepalbert13_200048283
Dreamstime_Wolfhound911_369393069
dreamstime_wolfhound911_369393069
Dreamstime_Surasak-Petchang_258989006
dreamstime_surasakpetchang_258989006
Dreamstime_ilya-pazniak_236890484
681a491b5ddae2a55b9e4852 Lithium Dreamstime Ilyapazniak 236890484

Battery-Cell Testing Considerations for Incoming Inspection (Download)

May 6, 2025
Log in to download the PDF of this article on tests that address incoming inspection of battery cells.

Read this article online.

While many articles have been written about cell testing in R&D labs or cell testing during manufacturing in the factory, let’s turn to the topic of cell testing for incoming inspection. This article covers testing strategies for handling this process. As an example, consider cells produced at a factory in China being delivered to a battery-powered tool manufacturer in the United States. What incoming inspection tests should be considered?

First and foremost, I recommend that these cell inspection tests should be pushed back onto the cell supplier, along with the cell purchaser’s requirements for measurement accuracy requirements and pass/fail limits.